OHC has partnered with Burns & McDonnell to conduct Asbestos and Lead Paint surveys at the TECO Big Bend Power Station in Apollo Beach. The station is an operating coal-fired power plant with four units totaling 1,700 MW. The surveys included Units 1-3, as well as the associated scrubbers, FGD units, coal yard structures, intakes and miscellaneous buildings.
Dave Alvelo
Comments